Energy accumulates; demand varies over time
kWh measures energy over a period; kW measures power. Two buildings may consume similar energy while having different peak demand.
A daily average does not reveal every brief increase. Assessment therefore needs the reading interval and aggregation method.
Main meters and submeters
Not every listed meter should be added together. A submeter may already sit within the main meter’s scope.
PV generation, import and export are also different flows. Reconciliation boundaries come first, followed by selecting points appropriate to the report.

Reference prices versus the bill
Market prices may exclude distribution, supplier margins, taxes and standing charges.
Cost estimates need contract terms and their effective periods. Reports should state whether they show a reference value, contract estimate or agreed billing calculation.
Comparisons need context
Month length, weather, occupancy and working days affect consumption. Missing readings can alter results.
Before evaluating an upgrade, check coverage, boundaries and comparable periods. A lower total alone does not establish its cause or prove a lasting saving.
Questions before drawing a conclusion
Before publishing a result, ask whether the period is complete, the unit correct, the meter scope unchanged and the operating conditions comparable. Then check the tariff and whether the value is measured, calculated or forecast. Cost models must identify included components.
Demand needs an interval and averaging method. PV requires a distinction between generation and on-site consumption. If an answer is missing, the report can still be useful, but the limitation should be explicit. An honest analysis is more useful than a precise number with no explained origin.
GOOD TO KNOW
Questions and answers
Does lower kWh always mean a lower bill?
No. Rates, charges and contract terms also matter.
Can missing data be filled with zero?
That usually distorts results. Gaps need explicit identification and an agreed treatment method.