Metering boundaries and communal areas
We begin with the supply arrangement, units and shared loads. Tenant consumption is separated from communal use, import from generation, and main meters from submeters.
Each point receives a name, location and purpose. This prevents the same energy flow being counted twice.
Remote readings without retyping
We check the meter model, outputs, protocol and communications conditions. Wired or wireless connectivity is selected for the actual site.
The panel should show the value, unit and reading time. A communications gap remains missing data rather than appearing as zero consumption.

Rates and allocation rules
Rates come from the customer’s confirmed contract or billing documents. Market reference prices do not replace invoice tariffs.
Reports can separate energy charges, consumption-related fees and an agreed share of communal use. Rate changes and periods are recorded so calculations can be reconstructed.
Reconciliation and changes of tenancy
Main and submeter readings are compared over matching periods.
Differences may reflect communal loads, losses, metering boundaries or missing data, rather than automatically indicating a fault. Changes of tenancy call for opening and closing readings and revised access without deleting the property’s history.
Before the first report
We prepare an assignment table covering meter, unit, circuit, measurement unit, opening reading and responsible person. Direct or transformer-based metering must be described correctly, with conversion factors not applied twice. Reporting cut-off times and late readings need agreed treatment.
Before handover, a sample period is compared with the physical meter and installation records. Where measurements support financial charges, equipment and billing requirements must be checked for the intended use. An energy sensor or inverter display is not automatically suitable for allocating costs between independent parties. These acceptance checks make the source and meaning of the figures easier to explain later.
Daily workflow and corrections
Billing staff first check period completeness, then review consumption. Unusual values should be compared with refurbishment, tenant changes or new loads. Corrections need an explanation and defined scope rather than an unrecorded overwrite.
Statement format, unit identification and the distinction between estimated and approved costs are agreed. A replacement meter requires the old closing register and new opening register to remain documented. Report users should be able to identify the reporting period, rates used and any gaps. Export access is limited to the appropriate accounts so convenience does not expose another tenant’s information.
GOOD TO KNOW
Questions and answers
Can an existing meter remain?
Yes, if its interface and condition support integration. We check the model before specifying the solution.
Does the report replace an invoice?
It can support billing. Commercial rules, metering requirements and the final document are agreed for the particular use.




